Hydro Power Plant Fibre Optic Solution

Eco Energy manufacturer employs AFL to plan, manufacture and install of SkyWrap and ADSS cables.

Download PDF

Eco Energy manufacturer employed AFL to plan, manufacture and install the following fibre link:
a) 48 fibre SkyWrap® from Switching Station along the 33 kV wood pole route to Power Station (total route length 4.084 m).
b) 24 fibre ADSS cable from the Power Station to the Dam Substation (total route length=3.484 km).
Existing communication and data transfer was via a copper pilot cable underslung along the existing wood poles.