Logan City Light and Power

May 15, 2018

Logan City Light and Power wanted to reconfigure a substation into a ring bus design with fittings to accommodate a new transformer, replace copper bus and complete the installation within 60 days. The solution? Install the ring bus substation design using AFL's Swage Aluminum Bus Accessories. 

Previous Video
Swage Grounding Installation Instructions
Swage Grounding Installation Instructions

This video shows the proper steps for installing Swage Grounding Accessories in an underground grid layout ...

Next Flipbook
Fairfield Electric Cooperative
Fairfield Electric Cooperative

Fairfield Electric replaces incorrectly-installed fittings on a new substation with AFL's Swage Bus Accesso...